Week 7 - May 19-23



Phil & Steve built a handicap ramp for Connie's Mom to be able to get in their house. Phil, Steve & Norman hung all the crown molding and some of the door casing. Erica, Eddie, Terry, Clara & Raeford caulked and painted. JD & Billy finished the siding on the front and side of the house, leveled floor in living room & installed luaun in kitchen & baths.


More week Seven - Most of the trim work was put up & painted. Matthew helped the guys from Pilot with the front porch rails. Brooke did some painting. The bathroom countertops were installed. Lounette visited with Shealy and did some sweeping. Travis helped with the luaun so we are ready for vinyl flooring.


Pilot Baptist Church came on Thursday. Back row-Rev. Kevin Byers, Yates Murphrey, Chuck Kremer, Clyde Davis & Jesse Murphrey, Front row-Alice Jones, Clara Murphrey & Elaine Lewis, & Me
They puttied nail holes, painted molding, doors and doorframes, installed some vinyl on back of house, installed vinyl porch railings on front of house, installed doorknobs, and did cleanup work. Elaine helped me put up a Coke wallpaper border.



Saturday, May 24, 2008

Week 6-A Week of Painting



On Monday morning we started by wiping all the walls with a damp cloth and then finished all of the priming. The rooms were then painted in several different and pretty colors. The Mcleod's finished all the walls while we were at NCBM training.
*********
Scrapbook credits:
Daniela Peuss - DIVA


Tuesday, May 20, 2008

Week 5- May 5-10

As usual I am still behind on posting to this blog. We are actually working in week 7 and I am reporting on week 5. I hope to get week 6 posted in a day or two.


This week Billy,Travis, JD & John worked on the vinyl siding. I even learned how to cut it. Trey worked hard on the sheetrock & finished on Saturday as promised. I'm just glad we did not have to do that job.


Connie & Brooke did clean-up. Bryan & Sharon came on Saturday. Bryan helped with siding and Sharon put in window jams.

Serve wholeheartedly, as if you were serving the Lord, not men. Ephesians 6:7

Friday, May 9, 2008

April 28- May 3


For the week of April 19-26 Billy & I were at Operation In-As-Much in Momeyer, Fort Caswell for the NAMB Disaster Relief Roundtable and Laurinburg for NCBM training. David, Frances, Chris & Lori, Sam & JD worked on the house while we were gone. The outside of the house was wrapped, the windows installed and the insulation completed. Sheetrock was delivered on Tuesday & we got to play with our new toy, the sheetrock lift. We were helped by Carey, Mark, Frank, Raeford, Sam, Terry & JD. Sam hung the front and back doors and we started the vinyl siding. Dean & Matt worked on the HVAC. Tanya helped JD with the siding. Bert & Lounette from across the street cut and raked grass.